Customization: | Available |
---|---|
After-sales Service: | Online |
Warranty: | 1 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The pump bottom is arranged with the mixing device, and the bilateral and multilateral separate mixer can be arranged, which can prevent pump blockage by the bulky fixed substance, so as to fully mix the solid with liquid, and facilitate handling.
The pump can handle the solid substance with the maximum particle size of 150mm, and the solid-liquid extraction concentration can be over 70%;
*Note: due to different conditions, the pump output may be changed with influence of the handling medium, field operation, conveying distance and other factors.
The device is mainly installed on the excavator, and the power is provided by the hydraulic station of the excavator, which can realize free transition. The power source is diesel engine, which can solve the problem of power inconvenience during construction in the remote area.
Overcurrent part: i.e., pump shell, impeller, guard board and mixing impeller adopt the high-chromium alloy. Other materials can be customi*zed.
The unique sealing device is adopted, so as to avoid frequent replacement of mechanical seal, and improve the working efficiency.
Dredging, mud and sand clearing, sand extraction, sand suction and so on of the port, watercourse, lake and so on.
Mud and sand, gravel extraction, land reclamation project;
Slag discharge of the iron mine, tailing pond, ore dressing plant and other mines, slurry discharge and all solution containing solid substance;
Absorption of the high-temperature iron slag, waste residue, high-temperature iron slag and iron chip in metallurgy, steel and other industries;
Sand extraction, gold washing and so on
It can be applicable for work in the shallow water zone and swamp, and can be used for watercourse dredging, lake development, wetland park construction, development along the beach, salt lake development, tailing control and other water conservancy project and swamp development project.
Serial No. | Model | Flow m3/h | Capacity (m) | Mixer | Mixer torque | Excavator tonnage |
1 | HDSE200-15 | 200 | 15 | 5.5kW | 1556 | 10T-20T |
2 | HDSE150-30 | 150 | 30 | |||
3 | HDSE300-20 | 300 | 20 | |||
4 | HDSE400-10 | 400 | 10 | 7.5kW | 1946 | 20T-30T |
5 | HDSE500-15 | 500 | 15 | |||
6 | HDSE250-35 | 250 | 35 | |||
7 | HDSE300-30 | 300 | 30 | 15kW | 2433 | 30T-40T |
8 | HDSE400-30 | 400 | 30 | |||
9 | HDSE400-40 | 400 | 40 |